A large Switchgear Equipment manufacturer serving the Oil & Gas, Transportation and Utilities was facing a stiff challenge of meeting the ever shrinking delivery times and increasing labor cost. They approached Changepond to help them address these issues.
Dedicated team of Engineers working for all 4 locations of the customer in North America.
Customer has seen a huge reduction in time to manufacturing and a 60% saving in engineering budget.
We benefited in engaging Changepond Reduced time in preparation of the control schemes and wiring diagrams and hence the time for giving the inputs to shop floor has come down to a greater extent which in turn have saved a lot of money and time - Director Of Operations.